Inspections & Handover
Seven-day inspections, handover certificates and tags — what has to be recorded, and when.
1 September 2026 · 6 min read
Handover certificates and tags: getting the paperwork to match the scaffold
A tag says the scaffold is safe to use. A certificate says what was handed over, to whom, and to what loading. They should never disagree — and on plenty of sites they do.
25 August 2026 · 8 min readSeven-day scaffold inspections: what the regulations actually require
Before first use, after anything that could affect stability, and at intervals not exceeding seven days. What that means in practice, and what has to end up in writing.