Scaffold adaptation record. A printable record of an alteration to a scaffold — what changed, who authorised it, who did it, and the inspection that has to happen before it is used again.
This is the paper version. ScaffoldOptix does the same job on a phone, with the record filed against the scaffold and the site automatically.

What is on the sheet
- Scaffold reference, the part altered, and the date and time the work was done
- What was requested, by whom, and why
- What actually changed: ties, boards, lifts, bays, guardrails, access, sheeting
- Whether the alteration is within the original design, and if not, what authorises it
- Who carried it out, and their competence reference
- The post-alteration inspection: who made it, when, the outcome, and the tag and register both updated
Why this record matters
An altered scaffold is a new structure. That is the whole point of this record: the inspection it had last week was an inspection of something that no longer exists, and the tag on the access point is now describing a scaffold that is not there.
Most unrecorded alterations are small, reasonable and done by somebody helpful — a tie dropped so a window can go in, a board lifted to get a cable through, a guardrail taken off to land materials. Each is a decision about a structure somebody else designed, and the record is how the person responsible for that structure finds out it was made.
The two lines that close the loop are the tag and the register. An adaptation recorded on a form in a van, with the old tag still on the scaffold and the old date still in the register, has documented the change and told nobody. Both are on the sheet as explicit ticks for that reason.
Where the alteration goes outside the original design, the sheet asks what authorises it rather than offering a box to tick. That is usually a designer's instruction, and if the honest answer is that nothing authorises it, that is a finding worth having in writing.
Use it with
- Scaffold inspection reportA printable scaffold inspection report for the inspections the Work at Height Regulations require — what was looked at, what was found, and whether the structure is fit to be used.
- Scaffold registerA printable site register of every scaffold on a job — reference, location, what it was handed over for, when it was last inspected and when the next inspection falls due.
- Scaffold handover certificateA printable handover certificate for passing a completed scaffold to the client — what was erected, what it may be used for, what it was designed to, and who is accepting it.
- Permit to load recordA printable permit for loading materials onto a scaffold or a loading bay — what is going on, where, whether the design allows it, and who authorised it.