Scaffold tag template. A printable scaffold tag for the access point — what the structure may be used for, when it was last inspected, and who to ask before touching it.
This is the paper version. ScaffoldOptix does the same job on a phone, with the record filed against the scaffold and the site automatically.

What is on the sheet
- Scaffold reference and location, matching the handover certificate and the register
- Status: fit for use, restricted use, or do not use — as the thing the tag says first
- The duty the scaffold was designed for, written in from the compliance sheet or design
- Date of last inspection and the inspector's name
- Restrictions and conditions, with room to write rather than a printed list
- Who to contact before altering, loading, sheeting or striking anything, with a number
Why this record matters
A tag is the only part of the paperwork the person climbing the scaffold will ever read. Everything else — the design, the certificate, the register, the reports — exists so that the tag can say something true, and a tag that says nothing useful has broken the chain at the only point where it meets a human being.
So status is the first thing on the sheet after the reference, and it is set in capitals as three plain alternatives rather than as a tick buried in a row of other fields. The order after it is deliberate too: what the scaffold may carry, then when it was last looked at, then who to ring. That is the order somebody standing at the bottom of a ladder needs them in.
The restrictions are a writing area rather than a printed list, for the same reason the certificate's are. The restriction that matters is almost always specific to the structure — a lift that is not boarded out, an edge that has no handrail because the building is in the way, a bay that must not be loaded — and a printed tick-list of generic conditions teaches people the tag is boilerplate.
Tags fall off, fade and get swapped. That is a real weakness of the format and it is the reason the reference on the tag has to match the register: when a tag is missing, the register is the thing that says what should have been there. A tag on its own is not a system.
Use it with
- Scaffold handover certificateA printable handover certificate for passing a completed scaffold to the client — what was erected, what it may be used for, what it was designed to, and who is accepting it.
- Scaffold inspection reportA printable scaffold inspection report for the inspections the Work at Height Regulations require — what was looked at, what was found, and whether the structure is fit to be used.
- Scaffold registerA printable site register of every scaffold on a job — reference, location, what it was handed over for, when it was last inspected and when the next inspection falls due.
Read more on this
© 2026 ScaffoldOptix. Free to print, copy and use in your business. Not for resale. Please keep this notice.
Contains public sector information licensed under the Open Government Licence v3.0. General guidance, not legal advice. Checked October 2026.